Home Portfolio Fisht Stadium, Sochi

Fisht Stadium, Sochi

Fisht Stadium was built for the 2014 Olympic Games. HMPS Business was brought in for stadium reconstruction for the 2018 FIFA World Cup. HMPS Business handled the designing of the automated control system and the utilities of the football field's natural grass.

Fisht Stadium was built for the 2014 Olympic Games. HMPS Business was brought in for stadium reconstruction for the 2018 FIFA World Cup. HMPS Business handled the designing of the automated control system and the utilities of the football field's natural grass.

Object area: 16.6 ha.

The technical "highlight" of this project is a mobile station for meteorological data collection and communication, which receives all necessary parameters (air temperature and humidity, soil moisture content) and displays it at the control station. Then the automated system in accordance with the designated technology activates a specified algorithm for the utilities' operation.